Hey Rob... Can you leave empties on tracks 1 or 2? I think my first move would be to couple on to warehouse track #1 with the engine and set the loads out to track 3... Then same thing with warehouse track #2 set loads to track 3. All the loads out are now in track 3 ( 8 cars right? )
I'm not going any further until I find out if I'm getting way-freight or Road switcher rates.