Well... the cardiologist is very conservative and that's good. The meds are working in that they're slowing everything down to the point where I'm not really aware of the stumbling engine in my chest. He says that as long as you control the potential blood clots, you can live a long life with Afib. In a couple of weeks they're doing an echo cardiogram to see if there's any other troubles that are causing the Afib, like a leaky valve. Then I'll have a Holter Monitor installed for a 24 hour session to measure my pulse variations in various activities. They want to use this to make sure it's not going too low or high and if they need to adjust the meds. All in all, it could be worse. I can always be worse.

Today, I finished shingling the main roof and attached the kitchen to the main building. I do have enough clearance to drill the holes to mount the gutters on the building side of the kitchen so I felt it was okay to go ahead and attach it. This way I can then install the main roof and get all the rest of the lighting wires hooked up.

Main Roof Complete

I used a "gravity clamp" to hold the kitchen and main building together while the glue sets. It was too unwieldy to put any clamps on it, and I am always afraid of hitting one of those delicate windows.

 Fastening Kitchen

After dinner I decided to hook up the rest of the lights and fit the roof. And then I found this...

Annoying Problem

After I found out that there wasn't enough clearance between the front roofs and the wooden gutters, I extended those roofs to be flush with the outside and would use brass gutters. But I forgot to modify the main roofs to match and these did have enough clearance to use the wood gutters. Now I have a dilemma. I can easily add the material to the big roof to bring it out flush, but it's a real pain to put shingles on from the bottom up. They don't work that way. I have a real chance of destroying the shingles that are already stuck. Clearly, I can't leave the mismatch looking this way. It just looks wrong since it is. I'll have to lay the shingles in almost one at a time to make up those starter rows. That may not work so I may have to re-shingle the whole side. I have enough material to re-do it if I have to. Not my first choice. Luckily, I didn't glue in the main roof. In fact, it fits so nicely, I'm not going to glue it. This way, I can get to the wiring if need be.

Attachments

Images (3)
  • Annoying Problem
  • Main Roof Complete
  • Fastening Kitchen
Last edited by Trainman2001