Skip to main content

Reply to "Did you bank the curves on your layout?"

BobbyD posted:

Putting some curved switches in, so how do you super elevate track where there is a crossover? Both tracks are on the same piece of wood.

I want to superelevate as well, but one of my curves on the loop has a curved switch in it, and both curves end into a switch, so I couldn't do a lead out.  Oh well, that's part of the design tradeoff I went with to get a track plan to suit my tastes.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×