Skip to main content

How long do you run trains? Do I need to be concerned about long run times

This coming Sunday at church I have been asked to run trains for the kids while our yearly Christmas special is going on. There are two Christmas trees in the church foyer that I placed track around. Standard gauge on one side and O-Gauge on the other. My plan is to run the MTH Ives National Limited set and the Lionel scale Polar Express. I have never run any train for 4 hours straight before. Should I bring additional engines to split the time? Do I need to be concerned about overheating?

Scott Smith

Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×