Several changes are in progress on the PRR Panhandle:

1) The storage yard is well underway, with all 5 switches installed.

2) Reworking of the power distribution setup is underway. A Block Power Controller will be added to individually control power to Blocks 4 (Hidden Passing Siding), 5 (Coal Mine Spur), 6 (Weirton Junction), and 7 (Hidden Storage Yard).

3) I removed a Z-4000 power supply. The entire layout will now be powered by the two 180 watt PowerHouse bricks. The TPC400 will front them and various blocks will be controlled by the BPC as described in item 2 above.

I hope to have some updated photos soon.

George