Skip to main content

Reply to "PRR Panhandle Division"

Updated 11/20/2009...

With the help of forum member Mike CT, I was able to rework my wiring diagram. The layout will now use a Block Power Controller (BPC) to control blocks 5 (Coal Mine Spur), 6 (Weirton Junction Yard), 7 (Hidden Storage Yard), and 8 (Weirton Steel Yard). These blocks will be powered by a Lionel PowerHouse 180. The remaining blocks will be controlled by a TPC 400 (either conventional or command) which is fed by a second PowerHouse 180. The revised diagram is shown in Photo 4.

I am in the middle of changing the wiring right now.

George

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×