Cool photos everyone!
I can finally run trains continuously on the mainline loop.
Here's a B&P local waiting for a signal, while a CR empty slab steel train passes.
The BP local is on the move as the slab train clears.
Hopefully I'll have the signals installed for this interlocking soon.