Skip to main content

 IMG_1997

 

I took my MTH 0-8-8-0 Erie Camelback to Mercer Junction to have Dave Minarek install a  BCR to replace the two AA rechargeable battery setup in the tender. Then we tested the locomotive on Mercer Junction's store layout. Dave and I were not happy with the sound quality, so Dave quickly(and cheaply) installed a new speaker while I purchased a few items. As Alan Miller of OGR says, "Having a great LHS is so important."

 

 

Dave and I both have a P&LE A2 Berkshire that are among our favorite locomotives, but the visual action of the Camelback got the other store patron's attention.

 

DSC_0029

Enjoy the short video of the Camelback on Dave's layout. The video was taken before the new speaker had been installed.

 

 

 

PapaT

Attachments

Images (2)
  • 0-8-8-0 Erie Camelback
  • A2 P&LE Berkshire
Videos (1)
Camelback
Last edited by PaPaT
Original Post

Replies sorted oldest to newest

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×