Skip to main content

IMG_2820The Legacy Station website says, "Corner Crossings allow your train to back up and were often used by real railroads when a turntable was not available."

 Has anybody tried to tie these into their layout? How would you use them Instead of a turntable? Are they used in a yard for switching? I just can't really seem to understand how to use this in a layout. 

Attachments

Images (1)
  • IMG_2820
Original Post

Replies sorted oldest to newest

Yes, it provides a way to work with L shaped table. I doubled the switch combos and added a wye for a double oval multiple route combo. I have never built a layout one of these.

I don't believe that I've ever seen it in photos of a real railroad trackage. They just make wyes with legs of a length larger than the average train at the end of a line.

It is interesting looking.

Attachments

Images (1)
  • O72_Corner_Crossing_Use_Example
PRR1950 posted:

In "real" railroading, these are used where rapid transit line cross and trains need to change direction.  See CTA's dual-track elevated intersection on Lake street in downtown Chicago as an example.

Chuck

yep, forgot about that one intersection. I even saved a photo of it, somewhere. I didn't see NYC use it or Philly. One example does not make typical.

 

Attachments

Images (1)
  • CTA_loop_junction

here's a basic use - it still seems to need another pair of switches/combo to be useful. Four sets of switches like the CTA would look cool - but I don't think the play value would be worth it. You could get close to the multi-line CTA version with Ross slip switches and the corner/switch combo. But, why?

Attachments

Images (1)
  • O72_Corner_Crossing_Use_Example_2
Last edited by Moonman

I do recall a track plan that used this - it was the "magic mountain" effect.

Two sides of the cross have the switches and curves. Remote powered switches with non-derail.

A mountain with four portals is built over the top.

The loop around the mountain has many more switches, a figure 8 with four more switches at a minimum.

The end result is that train will take various routes and one is not sure which portal it will exit from.  The operator sets the routes in a mixed fashion by flipping various combinations of the switches. I thought this would work best with Command control.

It's been a while since I looked at those bookmarks. I couldn't find them quickly. I was tempted to build it as something to take around. Then, I looked at the switch count.

Still, the corner crossing needs a lot of switches.

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×