Skip to main content

Great timing Swafford. I just got back home from visiting the new EMD locomotive assembly facility in Muncie, IN & it was interesting to compare the locomotive assembly process from the 2 manufacturers.

Did you notice the suspension compressing when the engine was installed on the frame (minute 2:53). Must be a really heavy engine. I had to watch it again to verify it.

These are just my opinion,

Thanks,

Naveen Rajan

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×