I am finishing up a elevated trestle project.I am not sure if the transition from land to the trestle is right.Also I transitioned from Fastrak to O gauge tubular before reaching the trestle.Can any of you guys post a couple of close up shots of what you may have created in a similar project?I have included a couple of pic's of what I came up with. Maybe it "is" ok?Just not sure.Thanks in advance for your trouble.Nick  

Attachments

Images (2)
  • ResizedImage_1425474858065
  • ResizedImage_1425475759468
Last edited by rockstars1989
Original Post

Replies sorted oldest to newest

As others have said, it looks good enough to me, but typically an abutment would be constructed to sure up the slope on each side and give a stable base for the bridge that would then be built to cross from abutment to abutment. At least this has been my experience with road design and construction - it may be different for railroads, but from what I have seen, it looks like the railroads typically employ this same design to their bridges.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×