Skip to main content

Here's what I got so far.  It's amazing how this stuff works out.  I didn't have to cut one piece of track. I had just the right cutoffs.  Ross never lets me down.  Just need to put all my joiners in, connect a few skinny wires and the NCCRR is off to the races.  When the last spike is driven and everything is tightened up, I will post one of my not so famous thirty five second videos.  As always. Cheers! 

 

IMG_0510

IMG_0511

Attachments

Images (2)
  • IMG_0510
  • IMG_0511
Last edited by William 1
Original Post

Replies sorted oldest to newest

As promised.  Set up with TMCC, 2 - IC Controls TPCs and 135 bricks.  I have an ARC set up too.  I like goofing around making recordings. May have to set up an ASC and wire up a switch or two.  Return loop into the kitchen?   I've got plenty of track.  That is my cherished Wabash triple lash up set and the NCCRR is also sporting some new tin.  It's all original prewar.  Need two No10s to pull the train now.  We got the muscle.  Sweet nectar!

Attachments

Videos (1)
IMG_0512
Last edited by William 1

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×