Skip to main content

The Prototype - Background & History

This layout is my attempt to model the 7 miles of the PRR Panhandle that ran through the northern panhandle of West Virginia and Steubenville, OH. The Panhandle was a second mainline of the Pennsylvania Railroad that ran from Pittsburgh to St. Louis.  It existed from 1848 through 1995.  Grif Teller immortalized the double track bridge across the Ohio River in the painting “Crossroads of Commerce” which appeared in the 1953 Pennsylvania Railroad Calendar.  That bridge still stands and the track using it serves Weirton Steel (now Arcelor Mittal) and the brick refractories and businesses on the New Cumberland secondary.  Unfortunately from Weirton Junction through Burgettstown and points east, the track has been pulled up and the right of way has been converted to a hiking / bike trail.

 

1953

 

I grew up in Weirton, WV in the 1950s & 1960s. I left in 1978, but still have family and other ties in the area. The PRR double-track bridge at MP 42.11 was always a source of fascination for me, even as a small child going to Steubenville with my parents and grandparents. However, it was not until I saw Teller’s painting (in the late 1990s) that I realized what I wanted to model.

Vital Statistics of the Layout:

  • Size & Shape: Folded dog bone - 8.5’ x 18.5’ x 10’ x 18.5’ – approximately 180 square feet.  There is an 8.5’x 5’ hidden storage yard under the western end.
  • Track:  Mostly GarGraves with some Curtis sectional curves, Curtis Hi-Rail turnouts, and a few Ross Custom Switch turnouts.
  • Yards: Weirton Junction, Weirton Steel, Coal Mine Spur, Hidden Storage
  • Command System: TMCC. Turnouts have Z-Stuff DZ-2500A & C switch machines and are both TMCC and pushbutton controlled.
  • Wiring & Blocking: 8 power districts are supplied from 2 power distribution panels. Home run wiring has been used.
  • Power: 2 Lionel 180 watt PowerHouses supply all track power to districts 1-8. Two (2) K-Line PowerChief 120 transformers power switch machines, lights, and some AC accessories.  All DC accessories, building lights, traffic signals and street lights get their power from various 3VDC, 5VDC, and 12VDC power supplies.
  • Signals: Z-Stuff DZ-1060 PRR position signals (4) & MTH PRR signal bridges (2).  The layout is only signaled for travel in the counter-clockwise direction.

 

Track Plan:

 

Districts are numbered and shown in their colors:

 

1 - Steubenville BLUE

2 - PRR Bridge & Weirton LT GREEN

3 - Weirton RED

4 - Hidden Passing Siding MAGENTA

5 - Coal Mine Spur BLACK

6 - Weirton Junction LT BLUE

7 - Hidden Storage Yard GREEN

8 - Weirton Steel Yard YELLOW

 

v226 PRR Panhandle Track Plan - Annotatedv226 PRR Panhandle - Hidden Storage Yard

 

Hidden Storage Yard:

This yard is reached by a long yard lead below the rear of the layout.  Storage is available for approximately 40 cars on 4 stub tracks.  A balloon track is available for turning trains.  The yard will permit Weirton Steel to accept arriving deliveries (coal, ore, empties) and ship product (coils, boxcars, empties).

 

 

Features of the Layout’s Western End:

Steubenville, Ohio dominates the western end of the layout. The center of the action is the intersection of Fourth and Market Streets. Fourth Street runs roughly east to west. Market Street will contain some of the nicer businesses, including a 5 story building. The west end of Fourth Street will be the "wrong" side of the tracks. There will be a seedy hotel and other run-down structures in this area.

The PRR station will be at the south end of town with the platform between the spur and mainline.

The coal mine and tipple just north of Steubenville supplies coal for Weirton Steel. The 2-track tipple can load approximately 4 cars at a time. The tipple spurs have been extended by several inches to accommodate track bumpers. A curved #6 Curtis switch allows the spurs to bend around towards the northeast. These tracks sit (level) on top of a plateau about 1.5” above Steubenville (behind Market Street). The coal mine is reached by a trailing point spur that allows coal trains to be backed all the way up to the tipple. The spur is protected by a Pennsy 3-position signal head.

The Gould No. 5 tunnel passes under the coal mine and exits just before reaching the Ohio River Bridge. Within the tunnel, a turnout connects to the hidden passing track that runs behind the screen and river bridge. This hidden track allows trains to cross the river without being seen.

 

Features of the Layout’s Eastern End:

The dual-track bridge is 7’ long and was supplied by East Coast Enterprises.  Originally, I had planned to build the bridge myself, but it proved impractical time-wise as well as prohibitively expensive.  I erected a temporary bridge that held a Curtis double cross-over, but I removed that when the permanent bridge was installed.  The bridge is protected on both ends by a pair of MTH PRR double-head signal bridges.  The southernmost track is for eastbound traffic, while the other (northern) serves westbound movements. East of the bridge (as the track loops back on itself and moves west) is Weirton Junction.

 

Stubenville 2 Track 84 Inch [14)

 

Weirton Junction is protected by a Pennsy 3-position signal head and will eventually sport a replica of the prototype WC PRR Interlocking Tower.  One track will be designated as Standard Slag, allowing Lionel and MTH slag cars to park here and discharge their slag loads. These tracks will also serve as an engine pocket for the WSX Alco S-2 switcher as it moves ore car cuts in and out of Weirton Steel. The track may also end up storing cabin cars.

 

 DSCN0030

 

The city of Weirton will be the center of the layout’s eastern region. Depiction of the city will focus on the appearance of North Weirton in the 1950’s. The Green Mill Restaurant (although it existed as a family business during the 1920’s and 1930’s) will be located here, just across Main Street from Gate No. 1. The mill wall will parallel Main Street to the intersection of County Road and Pennsylvania Avenue.

 

Downtown (North) Weirton at the intersection of Main Street, County Road, and Pennsylvania Avenue will feature several unique structures - the Triangle Building, Weirton Steel's Mill Administration Building (MAB), the Quality Control Lab (QCL), and the Honor Roll (a memorial for members of the armed services).  Working traffic lights will control the intersection and lighted telephone poles will illuminate the streets throughout the downtown area.

 

 NorthWeirton- with Lights

 

At Crawford's Crossing, Main Street will ascend a highway overpass bridge over the steel mill yard, just as in the prototype.

 

Weirton Steel:

Another major feature of the layout is Weirton Steel. The company’s mills are located against the eastern wall of the layout. The steel mills fit into the wall at a 30 degree angle. Mill buildings and items considered for this area are (south to north):

  • Open Hearth: This mill has 2 industrial smokestacks. Ingot (flat) cars will move in and out of this mill. This building will disguise a descending spur to the hidden storage yard. (Built)
  • Blooming Mill: This will also be a vertical channel black steel building with a WSX Logo on front. A billboard will be placed on the front. A raised transformer platform will sit at the side of the mill. (Built)
  • Strip Steel: This will be the largest of the mill buildings and will have a spur running into it. The spur will be used to bring in empty gondolas (exit with pipe and coil loads). (Under construction)

Other structures that will be part of the mill will be a tank storage structure, floodlight towers, and a coil yard.

 

BLM2 002

 

 

Operational Goals:

The PRR Panhandle was developed with the following operational goals in mind:

  • Allow the simultaneous operation of at least 2 trains on the mainline and 2 switchers in yards or spurs.
  • Use a signaling system that prevents collisions.
  • Have curves large enough to permit the use of 72’ scale heavyweight passenger cars (requires at least O42).
  • Allow the use of medium-sized PRR steam locomotives (requires at least O54).
  • Permit the running of long trains (10-15 hoppers or 6 passenger cars).


Electrical Goals

Building the PRR Panhandle was also my chance to learn about sound electrical and command control concepts.  The Panhandle was originally conceived (back in 1997) as a conventional layout.  I then decided to install TMCC, but was influenced by the arrival of DCS.  After trying a DCS/TMCC combination during construction, I decided TMCC was the direction to pursue.  In 2007, the change was made to solely TMCC.  Home run wiring and light bulbs (as block power indicators) were retained in the design.  The electrical plan divides the layout into 8 blocks or power districts – 4 mainline and 4 yards - with the ability to individually control power to the yards.  The mainline (districts 1-4) may be run in either command or conventional mode.  Yards (districts 5-8) are all command controlled.

 

Track power is distributed from two panels (East and West).  A wiring plan for the western panel (Blocks 1, 4, 5, 7) is shown below.  The eastern panel is comprised of fuses, power indication lights, and terminal strips for Blocks 2, 3, 6, and 8.  Track power is provided by 2 Lionel 180 watt PowerHouse transformers. 

 

Switch machines and AC accessories are powered, respectively, by two K-Line PowerChief 120F transformers.  Switch machines (DZ-2500a, DZ-2500c) are controlled by push-buttons in the fascia or by CAB-1 via 2 DZ-2001 Data Wire Driver buses.  There are 21 switches.

 

Power for lighting, traffic signals, and other accessories comes from either a 12 VDC regulated transformer or a 3 VDC power supply.  Their is a 12 VDC accessory bus and a 3 VDC accessory bus.

   

All transformers sit on a converted TV stand next to the Western panel.

 

 

 

 20131231 Panel

 

 

 

Updates to the Layout

Updates to the layout (photos, notes, progress, etc.) will always be highlighted as new Comments.  Updates tend to appear as a running narrative or blog on the progress (or lack thereof) being made.  Your comments and “likes” are always welcome!

 

100,000 Views and Counting!

 

I thank you for your viewership. This edition marks the layout’s 5th appearance on the OGR Photo Album since 2004. Over the years, the Panhandle has been viewed more than 100,000 times.   

 

Please send me or post your thoughts, questions, and suggestions in the Comments section.

 

I hope you enjoy the layout and my journey through its construction.


George

 

Attachments

Images (8)
  • 1953
  • v226 PRR Panhandle Track Plan - Annotated
  • v226 PRR Panhandle - Hidden Storage Yard
  • Stubenville 2 Track 84 Inch (14)
  • DSCN0030
  • BLM2 002
  • NorthWeirton- with Lights
  • 20131231 Panel
Last edited by G3750
Original Post

Replies sorted oldest to newest

Updated 2/2/2009...

Several projects are underway on the Panhandle:
  • The Weirton Steel Open Hearth furnace is about 99% done. Need to replace some roofing material damaged in transit. After that it gets installed on the layout.
  • Need to finally glue down the track and roadbed supports on the PRR double track bridge.
  • Hidden Storage Yard: I am in the process of laying down track, roadbed, and wiring feeds for the under the layout storage yard. This yard is designed to hold around 50 cars (hoppers, ore cars, coil-covered gondolas) and will be entered from Weirton Steel. Once the yard is built, I will raise it up to join the lead spur and fasten it in place.


Lots of stuff to do!

George
Hi Dale,

Thanks for the compliment on the wiring. I'm trying to emulate Mike CT on the wiring front, plus there are some EEs at work who do outstanding wiring work. If I ever want to invite them to see the layout, I've got to keep up! ;^)

Not sure I understood your comment regarding mixing of transformers. And I was probably unclear in my previous comment.

The western panel holds the terminal strip pairs for districts 1, 4, 5, 7. The eastern panel holds the terminal strip pairs for districts 2, 3, 6, and 8.

Districts 1-4 which form the main loop and the passing siding (see Blue, Lt Green, Red, and Magenta track segments in Photo 2) are powered by two 180 watt Lionel PowerHouse transformers. These districts also have the TPC-400 in the circuit so that conventional locomotives can be operated there.

Districts 5-8 are yards and spurs and are powered by both sides of an MTH Z-4000. I tend to move the handles to 15 volts, which mates up with the command setting of "Low" for the TPC (been awhile since I played with these settings). Thus far, I haven't experienced any locomotives going into "rocket assist" mode as they cross from the Lionel / MTH boundary.

Hope that was clearer. Thanks for looking!

George
hi George

my concern is if a car or engine with dual pickup rollers bridges 2 power districts. This in effect would parallel 2 unlike transformers with a 22 gauge wire.

This wire can not take the amperage to drive a train and the sine waves of the Bricks and Z4000 are different and can not be properly phased. This could be an issue with the transformer outputs and would not be breaker protected.

If there is no danger of this then it would not be a problem. Maybe I am missing something in the track plan.

Dale H
George

They have a shared common whenever a train bridges the 2 districts. The outside wheels connect them if the trucks are metal. When the 2 pickup rollers from any dual roller car cross the block the 2 hot leads are connected. If this happens the 2 transformers are paralleled via the pickup roller wire and outside metal wheeled trucks. If the transformers are dissimilar like a Z4000 and a modern ZW,it is almost impossible to phase them correctly because they may put out different shaped sine waves. On like transformers IMO the commons should all be connected and the transformers in phase with each other. The bricks should all be in phase with each other as the plugs are polarized. Still if 2 adjacent bricks are paralleled at different potentials, the small wire in a dual rollered car is back feeding some current to the block with less potential. Some early bricks were out of phase with later model bricks. Again I would not use unlike transformers if there was any chance they can be paralleled via the rollers. I only see one loop on your layout and assume the power districts are all adjacent. This may be a problem.

Dale H
Thank you Trainman.

Yes, I decided to use Vinylbed a long time ago. If I were re-doing the layout, I might consider one of the embedded roadbed products. Of course, things were different back in 2002 when I starting buying materials. The switches are mostly Curtis - they're gone now. The surviving choices are more expensive.

Too bad about your move. Will it be tough to re-assemble your layout or is this the excuse to rebuild it (larger?)??

George
Dale, the situation is indeed complicated when connecting different power sources to adjacent blocks.

(First, let me clarify that "dual roller" cars are a problem ONLY IF the rollers are connected together internally. Many passenger cars have two rollers, but each roller is connected to its own isolated set of lights, with not interconnect between the two rollers. I recommend inserting a "Polyfuse" self-resetting fuse in series with one of the roller wires to provide protection in the event of a derailment that places one roller in contact with the center rail and the other roller in contact with the outer rail.)

The "added complication" is that the nature of the power controller needs to be factored in. Some of our controllers, like the Powermaster for example, will supply power, but will not sink power - somewhat like having a diode in series with the output that reverses its polarity on each half cycle of the AC waveform. Power from another device of a higher voltage connected across the output of the Powermaster cannot flow backward through the Powermaster.

The Powermaster uses two FETs in series, with one being the controlling device and the other acting as the diode. The roles of the two devices reverse on each half cycle.

The TPC uses a single device that is essentially a Triac. When a Triac is turned on, it can conduct current in either direction eually well. Although I haven't specifically tested this (disclaimer!!), this would seem to allow a TPC to sink current back to its transformer source if a higher-voltage source is connected to the TPC output.

I don't know what devices are used in the newer ZWs or MTH products.

If the controller device has a blocking "diode", then dissimilar waveforms don't create a big problem. The higher-voltage supply may temporarily try to power both blocks while any dual-roller units with internal interconnects bridge the blocks, but there won't be any power fed back into the other transformer.
I have used a Z-4000 and post war ZW's in adjacent power districts for 11 years connected with a common neutral. I have run over 50 differrent locomotives from 6 different manufacturers and countless lighted passenger cars and cabin cars from K-Line, Weaver, 3RD Rail, Lionel, MTH and Williams with never any electrical problems. I run in conventional control from th throttles.
Dale M

Thanks for explaining,I always learn something reading your posts. My one concern was the wire connecting the roller feeding the block and not being able to carry the amperage. Not too many people seem to be installing the poly fuses. BTW the specs on the polyfuses are for DC current but I guess AC is OK? As far as paralleling the different transformers perhaps no harm would come but it raises a concern with me. I think if the transformers were PW ZWs links of the secondary coil would burn. Even with the modern transformers, I do not think I would do it without seeing a schematic and knowing for sure.

Dale H
I have used the Polyfuses on AC for quite a few years. It would probably be wise to use the peak voltage of the AC waveform when selecting devices, rather than the RMS value.

"Old School" transformers with sliding taps certainly can cause a problem if two mismatched voltages are connected together. There is also the hazard of a massive stepup if one transformer is not plugged in. The power plug could easily have 300 volts on the power pins!
George

I think after reading Dale M's post (Dale M is a college professor and EE) you may be OK doing it. It raises questions with me that can not be definitively answered without examining schematics of both transformers. These may not be available to study because they are proprietary schematics.. It is also way beyond my pay grade as I am not an engineer.

At the very least on dual roller cars I would install the poly fuse to protect the wire,regardless of transformers if they are set at different potentials. If it were me I would be more comfortable with like transformers in phase. The MTH and Lionels could even be 180 degrees out of phase. Sorry I am not of much help, perhaps I should not have raised the issue. Maybe I am paranoid but I never parallel any transformers,but I do share commons.

Dale H
Well Dale H, I'm glad you raised the issue.

I will give this some thought. If there is a real danger of an electrical problem, then I need to do something. I don't believe in a fix-on-failure approach.

Right now, we are not running trains and all power is disconnected as I work on the hidden storage yard below the western end of the layout. It will be at least a month before power connections are re-established. The timing for a solution appears right.

Thanks for posting it. And my thanks to all who responded and contributed to the topic.

George
CFFisher:

There's a fellow at York in one of the halls (Silver?) that sells these in mint condition, but they are a bit expensive. I have only the painting part of the calendar.

I grew up looking at that fabulous bridge. It is really something to see in person. It is so massive, yet my father tells me about walking across it when a train was on it and it shaking!

Hey, that's an impressive layout and website!

Best,

George
Updated 3/1/2009

This last photo is one I took over a year ago. I was trying to see how many trains I could run simultaneously with one CAB-1 remote. The answer (on this small of a layout) is 4. We have a K4s ramming a stopped passenger train with multiple, minor injuries.

The subsequent NTSB investigation quickly dismissed reports of a large marauding orange Maine coon cat.

George
Last edited by G3750
Updated 3/13/2009...

Latest photo shows my hidden yard under construction. Ignore the date on the photo, I took the picture tonight. The yard will hold around 50 cars and will be accessible via a long descending spur. Construction details:
- Vinylbed (1/4" as per yards; 3/8" for mainline)
- Ross switches w/ DZ-2500 switch machines (TMCC controlled)
- Balloon reversing track with 4 stub end tracks inside
- Curves are all O31
- Track is mostly GarGraves, with some Ross sectional curves

George
Last edited by G3750
Updated 4/10/2009...

Photo No. 3 now shows the track plan for the hidden storage yard. This yard uses 5 Ross O31 LH switches. The turnouts are all TMCC controlled via Z-Stuff DZ-2500 switch motors. The yard sits on 1/4" Vinylbed. Being hidden, it will not be ballasted or sceniced. It has a reversing loop and 4 interior stub tracks. I think it will hold about 50 cars. Actually upon further review, I think 40 cars is probably closer to the maximum capaciy. If I'm really stacked up, I can put another 10-14 cars on the yard lead.

The purpose of the yard is to store trainloads of materials brought into Weirton Steel and to provide trainloads of steel products for shipping out of the mill.

As usual, comments and questions are welcome!

George
Last edited by G3750
Updated 5/17/2009...

Several changes are in progress on the PRR Panhandle:

1) The storage yard is well underway, with all 5 switches installed.

2) Reworking of the power distribution setup is underway. A Block Power Controller will be added to individually control power to Blocks 4 (Hidden Passing Siding), 5 (Coal Mine Spur), 6 (Weirton Junction), and 7 (Hidden Storage Yard).

3) I removed a Z-4000 power supply. The entire layout will now be powered by the two 180 watt PowerHouse bricks. The TPC400 will front them and various blocks will be controlled by the BPC as described in item 2 above.

I hope to have some updated photos soon.

George
Last edited by G3750
Updated 5/25/2009...

I have uploaded another progress photo from my work on the hidden storage yard. The 5 switches are in place. Track feeds are starting to hang down from underneath the subroadbed. The spurs are going to end up about 5-7" apart (center rail to center rail), but I think being able to get a hand in to adjust derailments might trump an extra spur.

As always your comments and questions are invited and welcomed.

George
Updated 5/26/2009...

Progress is temporarily halted as I have run out of GarGraves track to install. I have the length to finish one spur and enough pieces to finish a second, but will still need more. I'm also thinking about what additional track will be required to finish the Weirton Junction Yard.

Along with completing the spurs comes wiring the end-of-track occupancy detection circuits. I plan to signal the occupancy of each spur by turning on the light in rooms in various buildings around that end of the layout. Some very interesting vignettes are going to get illuminated... Wink Big Grin

George
Great stuff George. Glad to see it is coming together. I've been biking the Montour Trail (Railroad) since early May, made it to the McDonald viaduct Monday, which is also where the Panhandle Trail (Pennsy) ties into the system. This Saturday I hope to take the Panhandle Trail toward Weirton, WV. Maybe I can get some pictures. The McDonald viaduct is great.

Mike CT
Thanks Mike!

My next step after completing the yard and lifting it into place will be to tackle the power distribution changes to the total layout. I still have the BPC but haven't wired it into the system yet. In fact, I'm still working on the wiring diagram in spare moments. Gee, plan the work and then work the plan - what a concept! Anyway, I will get back to you just as soon as I have that done.

As to biking the trail, that sounds like fun. Maybe I will repost my thread "Ghost of the Panhandle".

Thanks again for commenting!

George
Updated 6/5/2009...

I finished laying the track for the hidden storage yard last night. There are end-of-track occupancy leads for every stub (all 4) as well as track bumpers. I've got automotive terminal strips under each stub for easy connection to lights somewhere on the layout. My thread in the Scenery Forum (dumpy hotel) is related.

I've uploaded a new photo (new #10) which shows the completed trackwork for this part of the layout (see Photos 7, 8, 9, 10 for stages of construction). I still need to wire the track (connect the feeder wires hanging down under the table). All track feeder wires will attach to a large terminal strip which will be wired to the western power distribution panel.

Next steps will be to wire and program the DZ-2500 switch machines, lift the yard to its correct height, and connect the yard lead track.

But we're getting there. Wink

George
Last edited by G3750
Updated 6/8/2009...

My hidden storage yard will use track occupancy circuits at the end of each stub track to tell the engineer when to stop backing the train. Each of those circuits will light a lamp in certain rooms around the layout. Most of those circuits will terminate in a dumpy hotel building just above the storage yard and next to the mainline.

In looking at the available real estate for the hotel, I came to the sudden realization that I would have to move a signal. The building will actually be a deep backdrop (6" deep at the building front and 4" deep at the rear of the building). To accomodate the hotel, the signal would have to move to the backyard of the building.

Yesterday, I moved the signal. This involved putting a new "floor" in place in the triangular space selected for the signal, relocating a terminal strip, and reattaching the wires. It was a tight fit, but I can see real potential for this dumpy hotel with the signal in back.

The only trouble is that my imagination far outpaces my available time.

George
Updated 6/30/2009...

My under the layout storage yard is built on a 3/4" plywood piece roughly 34" x 8'. It's temporarily propped up on plastic storage bins until I screw it into place.

Tonight I get a chance to do some real work. The family is out, it's just me and the cats (Pumpkin and Samantha). I've raised and propped one end of the board and now I'm working on the other. From a sitting position, I get the other end raised up and am about to put another storage bin under it when...the end of the plywood starts rocking violently.

I look up and there's Samantha walking up the lead towards the yard. I evicted her and managed to get the yard propped up without dropping it on my knees.

Curiosity...

George
Updated 7/15/2009...

Corrected and expanded the introduction to reflect changes in my thinking. Updated some of the descriptions of the existing buildings. All-in-all, minor editing.

I am hoping for some time off next week to get real work done on the layout. Areas of focus (in priority order) are:
  • Complete new electrical wiring diagram
  • Program all 5 DZ2500A switch machines for hidden storage yard
  • Raise hidden storage yard to its final position and mount in place
  • Reconnect power based upon diagram
  • Start running trains again


George
Last edited by G3750
Updated 8/7/2009...

Unfortunately, we suffered a refrigerator water-line leak in the early hours of this morning. The layout is not damaged, but work is halted while the water damage is assessed and restoration is in progress.

I was planning to bolt the hidden storage yard in place when this happened. Instead my oldest boy and I had to shoe-horn it out from under the layout so that a repairman could access the damaged ceiling tiles above.

What a mess! Frown Mad Eek

More when I know it.

George
Last edited by G3750
Updated 10/17/2009...

I had some inquiries from forum members while at York and figured I should update folks. We are not quite back in operation, but I can see the light at the end of the tunnel. All plastic storage bins have been transfered from under the layout to the furnace room. The train room carpet has been cleaned and most of the ceiling tiles are back in place. At some point in the near future, I will take the opportunity to inspect the bins, inventory the contents, and replace them back under the layout. Please see photos 4 & 5.

In January, I completed a scratchbuilt model of the Weirton Steel Open Hearth (greatly foreshortened of course). It's actually an oversized 3-dimensional backdrop. It's made of foamcore backing with Plastruct and Evergreen roof and sides. Two Lionel Industrial smokestacks add smoke to the room. That is in photo #6.

I also completed my hidden storage yard (photo 7) and was a few hours away from installing it when the water damage occurred. I still need to get it back in place, program the DZ-2500 switch machines, and wire it to the rest of the layout.

While all this was going on, Tommy Gilbert in Gettysburg completed the repainting and detailing of a Lionel Western Pacific Alco S-2 (TMCC, Railsounds) into Weirton Steel #208. The prototype joined Weirton Steel's roster new in December 1949. In photos 7 & 8, note the modified stack, safety striping and prototypical paint and details. Many thanks to forum member Price Bradshaw for storing the locomotive on his layout and allowing me to photograph it there.

More steel mill buildings, a highway overpass, some buildings and other things are in the planning stages, but first I need to get the layout powered and operational again.

Comments and questions are always welcome!

George
Last edited by G3750
Updated 11/20/2009...

With the help of forum member Mike CT, I was able to rework my wiring diagram. The layout will now use a Block Power Controller (BPC) to control blocks 5 (Coal Mine Spur), 6 (Weirton Junction Yard), 7 (Hidden Storage Yard), and 8 (Weirton Steel Yard). These blocks will be powered by a Lionel PowerHouse 180. The remaining blocks will be controlled by a TPC 400 (either conventional or command) which is fed by a second PowerHouse 180. The revised diagram is shown in Photo 4.

I am in the middle of changing the wiring right now.

George
Updated 11/28/2009:

ALIVE!! It's Alive!

Sorry, I got carried away with the Young Frankenstein references. Maybe it was looking at Teri Garr that caused it!

Anyway, I am pleased to announce that PRR Panhandle is powered and running and back in business!! I want to give a special thanks to forum member Mike CT for providing the BPC and proofing my wiring diagram.

The new Block Power Controller (BPC) is now part of the western power distribution panel and is controlling juice to Blocks 5 (Coal Mine Spur), 6 (Weirton Junction Yard), 7 (Hidden Storage Yard - when it gets installed), and 8 (Weirton Steel Yard).

The next step is refitting the Hidden Storage Yard back under the western end of the layout, programming its DZ-2500 switch machines, and wiring it to the rest of layout.

George
Last edited by G3750
Updated 12/21/2009:

I have more progress to report, although it is not strictly related to the layout. During the big snowstorm this past weekend, I was able to re-organize and catalog a number of storage bins holding train cars, automobiles, and related items. I now have an updated master list. Probably some thinning of the herd will take place soon. All these storage bins had been in the furnace room (workshop) since the water damage in August. These were moved to their usual storage spots under the benchwork.

Came home from work yesterday to find out that my eldest son had finished cleaning and organizing the workshop! Wow, what a nice surprise!

Then he helped me put the yard back under the layout. I still have to wire it up and program the switches, but we're making progress.

Bottom line, we're back in business. There are clean work benches and projects waiting!

Feels great!

George
Updated 02/14/2010:

Last night after a few hours of moving around support boxes and using a car jack, I finally got the storage yard into its (fingers crossed) permanent location. I still have to connect the lead track’s roadbed, but all other supports have been screwed into their locations. The yard is attached to 4 existing layout legs and I have one new leg supporting it as well. Wiring and programming of switch machines is next. The whole thing took about 5 hours. Photo 6 shows the yard prior to installation. The last 3 photos in the album show the yard as it is installed.

I'm pretty happy with how quickly it went into place. Progress!

As usual, your comments and questions are welcome!

George
Last edited by G3750
Updated 2/21/2010:

Tonight I completed wiring the hidden storage yard track to the western distribution panel. I also connected insulated control rails (used for detecting track occupancy) for the 4 stub yard endings to a master cut-off switch (single throw; quadruple poles). I updated the wiring spreadsheet for the western distribution panel. The yard uses cascading terminal strips; I just didn't want to have seven 6' wiring runs.

Given all the wiring, false starts, and reworked wiring over the past 4 years, I've nearly gone through the two 500' spools (red and black) of 14 gauge stranded wire.

Next up:
Lay the final connecting single piece of track to the yard
Program the DZ-2500A switch machines for the yard
Test, test, test!

George
Last edited by G3750
Updated 2/26/2010:

I seem to be swimming upstream against a heavy current. Talk about doing things the hard way... I should have installed the buss drops to the 5 yard switches (from above) BEFORE putting the yard in position. Makes it harder to run control wires.

The struggle here is to stay disciplined and wire ONE yard switch and then test it. The temptation is to do all 5 switches and end up backing that stuff out or debugging all 5 installs.

So far I've got buss drops to 3 of 5 switches, but my transformer cart has not been hooked up yet. Baby steps...

George
Updated 2/28/2010:

The struggle continues, but I am making some progress. Switches 17, 18, and 20 are programmed and operating under TMCC. Switches 19 and 21 still remain. I'm experiencing some problems with the pushbuttons, but we're still chasing those.

The layout has been powered up and the BPC is working properly. Track power to the yards is being controlled through that device. Power is available to the new yard (I have cabin cars lit up on all the stub tracks).

George
Updated 3/6/2010:

Wire nuts - both a blessing and a curse!

I've learned that wire nuts are really useful and potentially misleading when putting together two wires of different gauges. I had one disguising that fact that the two wires had become disconnected. That's what was causing my DZ-2502P pushbutton to show both RED and GREEN indicators as ON. I decided to check all the connections one more time, which is how I discovered the problem.

We probably don't have any issues with any of the DZ-2502Ps. I'm in the process of wiring those - maybe I'll get to them today.

George
Updated 3/07/2010:

I am still in the process of wiring the last two switches on my hidden storage yard, but I couldn't resist a test run of my Weirton Steel Alco S-2 switcher. I slowly ran it down the steep descent, O72 curve and long lead to the yard. I picked up a cut of 9 MTH ore cars and started back up the hill. About half-way, the switcher started to spin its wheels, so I cut off the last 4 cars. The locomotive inched up the descent like a champion and pulled the train completely out of the mill complex.

I will publish photos soon, but I had to post this. I'm really excited about this major piece of functionality.

George
Updated 3/14/2010:

As promised, I've added 3 new photos featuring the Open Hearth and the hidden storage yard. One of the photos (7, 8, or 9) has 2 things wrong. Can you spot it? If so, leave a comment.

I haven't had any time to focus on the problems with a couple of DZ-2500 switch machines, but they'll get my attention soon. I did clean up some of the wiring bundles. I also installed a ground plane per Bob Bartizek's instructions (OGR Run 218, December 2006). Thanks Bob!!

George
Thank you Charlie for the nice words.

That is the first structure I've ever scratch built (why did I pick one so big?). There are going to be more mills. To the left of the building will be an overpass (like you see in Photo 5) and then a blooming mill, office building, and then the Strip Steel mill. These should dominate the entire wall and corner on that side of the layout.

I can't wait to see your video. Is your H-10 conventional or command control?

My father (93) remembers triple-headed ore trains pulling into Weirton Steel in the 1930s. They were probably I-1s Decapods (that's my guess) or maybe M-1 Mountains. The timeframe is too early for J-1s.

I see by your signature that you are a member of PRRT&HS. I just mailed my application today.

Best,

George
quote:
Originally posted by pennsyk4:
George
My railroad is conventional control, using 2 control panels and block system
I added a sound board to the H-10
the PRR probably used hippos on that ore train your father remembers.


Charlie,

You're probably correct. William Neale, who's PRR Panhandle Division (in HO) appeared in a Model Railroader special edition, was kind enough to send me information on the bridge in Grif Teller's painting. I grew up in that area. Bill and I have exchanged info on various aspects of Weirton & Steubenville. Anyway, an April 2, 1927 edition of Railway Age magazine discusses the construction of the bridge (the 3rd on the site). The bridge was designed to bear the weight of multiple Decapod locomotives and a certain loading of axles per those locomotives and associated freight trains.

More than likely, it was I-1s Decapods that my father saw.

George
Update 4/14/2010:

I put in a ground plane just above the hidden storage yard, but apparently it is not big enough (only 1 wire). I will need to zig-zag more wire above the yard to maintain control. I had my first run-away train in the yard last night. I had to hit the E-Halt button; no damage, but a car was knocked off the track.

I've also been playing with track occupancy circuits using different ways to dim the lights. The bulbs are going to end up in a hotel (lighting different rooms) and they are not rated to handle 18 VAC track power. I may try wiring 2 in series to knock down the current.

Got the train room and layout cleaned up in preparation for some visitors prior to York next week.

I'm looking at some specially made pilots for the Williams K4s that may allow me to double-head them. I'll report back on how well this actually works.

That's it for now.

George
Last edited by G3750
Updated 5/1/2010...

I picked up some interesting things at York last week, including 18v LEDs, bases for them, and several sets of wired sockets for them. I decided to stop fiddling with diodes, resisters, potentiometers and the like and take the straightforward route. I have installed 5 of the LEDs for track occupancy circuits.

I also expanded the ground plane over the hidden storage yard by 3 wires which are attached to the main wire by "suitcase" connectors. That should help TMCC down there.

George
Updated 5/8/2010:

I attended the PRR Technical & Historical Society national convention in Camp Hill last weekend. I picked up some excellent information and materials on the Panhandle as well as some Tichy O Scale windows. It's time to start planning the next construction steps / projects. In no particular order:
1) Seedy hotel at wrong end of tracks
2) Finish Weirton Junction yard
3) Build more mill buildings
4) Build Weirton Junction tower
5) Build ingot mold cars for Weirton Steel

More when I know it.

George
Updated 5/9/2010:

I am pleased to report that NMRA judges visited the PRR Panhandle this past Wednesday and that I have earned my Electrical Achievement award.

To those of you who may have less than flattering opinions of the NMRA, I must report that I have been the recipient of much goodwill, sage advice, and respect and that my interactions with these folks have been nothing less than a blast.

George
Updated 5/11/2010:

We are now running Snappers (helpers for the non-Pennsy folks) on the PRR Panhandle!

Previously, I had used TMCC to double-head my K4 Pacifics. Tonight I put one K4 at the head of the train and one in pusher service at the rear and ran them as a single TMCC Train. It worked beautifully!

I realize to those running diesels, this is not a big deal, but I'm pretty excited about it!!!

George
Last edited by G3750
I'm pleased to announce that the PRR Panhandle Division has now been viewed more than 10,000 times in this go-around! In 4 previous postings over the past 5 years, it has been seen approximately an additional 28,000 times.

Thanks to all of you for your continued interest! Knowing that you are following the layout's progress keeps me moving forward.

Thanks everyone!

George
Last edited by G3750
Updated 07/08/2010:

I have been coming to grips (slowly) with the fact that I have waaaay too many freight cars for my layout. Years ago, I laid out plans for as many as 20 trains that might run on the PRR Panhandle. Unfortunately, I don't have the space to store them all and realistically, I can only run 3 (short) trains simultaneously. All of this got me to thinking about what the realistic length of trains could be. I am not only limited by the layout, but also by the pulling power of my locomotives. With the ability to double-head or use a snapper (pusher), I have become curious as to the practical length of my trains. So, here's my list of experiments that I'm going to run over the next month or so:

1. Number of K-Line & Williams 18" heavyweight cars that can be pulled by the M1a
2. Number of K-Line & Williams 18" heavyweight cars that can be pulled by the double-headed K4s
3. Number of MTH ore cars that can be pulled by the M1a
4. Number of MTH ore cars that can be pulled by the double-headed K4s
5. Number of MTH ore cars that can be pulled by the double-headed L1s+B6sb
6. Number of box cars that can be pulled by the M1a
7. Number of box cars that can be pulled by the double-headed K4s
8. Number of MTH ore cars that can be pulled by the 2 K4s in snapper configuration
9. Number of box cars that can be pulled by the 2 K4s in snapper configuration

All these experiments have to be done after properly lubricating the engines and freight cars (just to have a good reference point).

I will post the results here as we get them.

George
Updated 7/19/2010:

My first experiment (No. 1), the number of K-Line & Williams 18" heavyweight cars that can be pulled by the M1a, has been run. To be accurate, the train consisted of:

  • PRR B60b Baggage Car #9010 (Weaver)
  • PRR B60b Baggage Car #7906 - REA (Weaver)
  • PRR Broadway Ltd Coach #2544 (Williams)
  • PRR Broadway Ltd Coach #2543 (Williams)
  • PRR Broadway Ltd (K-Line set K4480-4486) Dining Car #4486
  • PRR K4480-6511 Railway Post Office #6511
  • PRR K4480-6042 Baggage Car #6042
  • PRR K4480-8815 Observation Car #8115 "Metropolitan View"
  • PRR K4480-0001 Pullman #0001
  • PRR K4480-3615 Coach #3615 "Herald Square"
  • PRR K3466 Coach #3466 "Times Square"


The M1a pulled 11 passenger / baggage cars with little effort. On my one difficult grade, the engine visibly slowed with all 11 cars, but I would estimate this to be nearly a 6% grade and on a curve to boot. It was pretty amazing to watch. And while I was moving the train by hand, I was surprised at how heavy it was.

I don't have any more "varnish" so this concludes Experiment #1.

More when I know it.

George
Updated 07/21/2010:

Just a couple of notes on the experiments...

One of the Weaver B60b's had a coupler that would occasionally open under the strain. Tonight I took that car out of the train and ran 10 passenger cars with the M1a just to see how fast I could go. I didn't have a speedometer, but I would guess we were doing much less than the 70 mph Pennsy limit for passenger trains (maybe 30 mph?). That 6% grade is pretty tough.

Also, I tried to run the passenger cars with double-headed K4s, but the second engine is having derailment issues. I'll have to look at that soon, but for the time being, that test is deferred.

George
Last edited by G3750
Updated 08/23/2010:

The doldrums of summer continue...haven't done too much on the Panhandle the past month what with summer vacation and kids' events. I did manage to:

  • Ship my second K4s off to a repair shop to fix the "wheelie" problem with the pilot truck. Should have it back soon and double-heading will be possible again.
  • Order and receive O scale styrene brick sheets (1900s Flemish Bond pattern) from the N Scale Architect for my Weirton Junction PRR interlocking tower.


I need to finish that time machine so I can get around to doing the 10 or so backlogged projects on my list! Big Grin

I'm looking forward to York.

George
Updated 10/1/2010:

Still haven't gotten around to fixing that time machine Big Grin, but here's the latest:
1) Got the second K4 back from repairs. Load testing to resume shortly.
2) Got the train room and office cleaned up (was waaaay out of control). Eek Passenger cars are now stored off layout (closet).
3) Watch for my new photos of my scratch-built ingot mold flatcars. I think that will be a new photo thread.
4) Revamped the To-Do list for the layout. Why don't these things get shorter?? Confused

George
Updated 10/9/2010:

Did some serious switching with the S-2 tonight. The switcher took 12 ore cars + cabin car down to the storage yard, moved a cut of 10 cars to stub track #3, moved remaining cars + torpedo car to stub track #2, and retrieved a cut of boxcars. With a running start, the S-2 and consist got back up the hill and tacked them onto another locomotive.

During the session, I tested Item 5 from my 7/08 list of experiments:
quote:
5. Number of MTH ore cars that can be pulled by the double-headed L1s+B6sb

The answer is "all I got" - 12 ore cars and I did not double head the L1 wth the B6sb. It did it by itself.

Also found two trouble spots with the track, which I will fix tomorrow.

George
Updated 10/11/2010:

With York only 3 days away, I finally completed my inventory and re-organization of the collection. I started this task two weeks ago and worked on it in an off-and-on manner. Several things have come out of it:

  • More efficient packing and consolidation of storage boxes holding the collection (each box is externally labeled and holds a content list within)
  • An organized spreadsheet of all boxes and their contents
  • An organized inventory of locomotives, rolling stock (by type), buildings, accessories, vehicles, etc.
  • A short list of items I want to sell or give away, many of which have appeared on the For Sale or Trade forum.
  • Improved organization of boxes and space under the layout.
  • Freed up storage space and shelves in the workshop.


Feels good to have this done.

George
Updated 11/1/2010:

I attended "The Great Scale Model Train Show" in Timonium, MD on Sunday. It really lived up to the name. I found a great number of Tichy windows and doors, wall-mounted lit bill-boards, roof ventilators, and other detail pieces you don't see very often. The windows solidified (in my mind) the design of the Weirton Strip Steel Mill.

This is good; we're going to end up with 3 mill buildings that have distinctive features but obviously share a pedigree.

Last night, I started a new project container with the windows and notes on the Strip Steel building.

Now all I have to do is live long enough to build all this!

George
Updated 11/3/2010:

As those of us building layouts know, we often revisit finished work and re-assess "done" items. Sometimes this is just a case of our own obsession for perfection, but sometimes there are real, lingering issues to correct. Right now I am debating some of the Panhandle's trackwork issues and the decisions that created them. Areas of concern are:

  • The metal bridge (7' in length) that spans the 2 segments of the layout. I expected a straight, rigid, perfectly bent "shelf" when I ordered it. That isn't what I got and I'm a bit frustrated trying to use shims to get it properly in place. I am experimenting with different braces to see if I can get a level platform with it. If I am unsuccessful, I will replace it with a 5/8" or 3/4" wooden deck. That will require lifting the double cross-over and re-wiring it. I've already taken photos of the underside wiring in anticipation of this dreaded task.

  • Several track joints are too wide and will need to be closed up. This will require re-location of power & ground track feeders, but I'm coming to realize the improvements will be worth the effort.

  • Several spots require more track screws to level out the trackwork and make for a smooth ride.

  • Several power & ground track feeds where I've tucked the wire into the rail will be replaced with spade connectors that snap into the track. This will improve electrical conductivity.


I've often said on this forum that reliability trumps all. It's time to make that a reality on this layout.

George
Last edited by G3750
Updated 11/8/2010:

Got a number of things done or underway this weekend:

  • Made track and roadbed repairs. Jury is still out on whether or not the metal shelf serving as a bridge will be replaced.
  • Repaired the roof of the Open Hearth (I had a section that had warped and bubbled).
  • Widened the south entrance of the Open Hearth to accommodate bottle cars.
  • Removed a non-functioning pushbutton (it has a partner that works). I tried to have 2 pushbuttons operate the same pair of cross-over switches. That doesn't work.
  • Cut the highway roadbed for the highway overpass at Crawford’s Crossing and determined its placement.
  • Came up with a way to mate two pieces of matte board for the roadbed in mid-slope (carpenter’s shims).
  • Determined the size and location of the Blooming Mill (billboard, transformer and stand); the detailed plan is now in progress.
  • Determined the location of both light towers in the Weirton Steel Yard.
  • Came up with a preliminary plan to separate Weirton Junction area from Crawford’s Crossing (small backdrop and tree line).
  • Came up with a preliminary design for the size and look of the Strip Steel. It will end up being the largest building on the layout.


George
Updated 11/18/2010:

Made some progress:

  • Painted all the Crow River components for the highway overpass.
  • Painted the highway roadbed (1/8" masonite) for the overpass at Crawford's Crossing.
  • Purchased automotive pin-striping (white) to use for the highway line markers.
  • Completed the plan for the Blooming Mill.
  • Partially built the frame for the Blooming Mill. This will be a foamcore building with a wooden supporting frame.
  • Located a photograph of the Strip Steel Mill that will serve as a reference for its construction.


Assembling the highway overpass will probably be the next task.

George
Updated 11/22/2010:

Replaced the photo (#6) of the Open Hearth with a better one showing my new ingot mold cars.

Did some work to determine the position of the Blooming Mill and the highway bridge (West Virginia Route 2 or Main Street) over Crawford's Crossing. Added a photo showing the approximate positions. In photo 7, the clamps are holding the legs in place while I level the building. BTW, the mill ended up being a bit shorter than is shown in the photo. I'm not sure the track segment protruding out of the Blooming Mill will survive - there isn't much space there. That's TBD.

The 4-lane road is a piece of 1/8" masonite which I will paint. I have its position finalized. Supports and guard rails (Crow River) for the overpass are painted; assembly is next.

As always, comments and questions are welcome!

George
Last edited by G3750
Updated 11/29/2010:

A Thanksgiving trip to Weirton yielded dozens of new photographs of the following areas / subjects of interest:

  • Strip Steel - got a number of shots of the building's end walls. I am working on the design for the layout.
  • Electrical towers - Weirton Steel used a variety of structural shapes and sizes of towers to suspend power lines.
  • Blooming Mill - while most of the mill has been torn down, some small pieces (the one I want to model) remains and I got some good shots of them. Should help sort out the proportion issue I'm struggling with.
  • Wall along Main Street - took some photos of the concrete wall for use in representing it.
  • Mill Administration Building - was able to capture some of the detailed brickwork in this structure.
  • General - got a number of photos showing the general deconstruction of the mill. Very sad, really.


Along with a great visit with family, this trip provided terrific resource material for new buildings and layout improvement.

George
Last edited by G3750
Updated 12/3/2010:

I had some progress since the last posting:

  • Made yet another height adjustment to the Blooming Mill, lowering it 1.25" (5 scale feet). This involved moving one of the side wall frames, but the change is more prototypical and helps keep the dimensions proportional. I tested the clearances and we are good to go.
  • Front and sides of the Blooming Mill have been cut out of foamcore using their new dimensions. They look much better. As soon as I get these photographed, I will mount them to the framework.
  • Ordered additional Crow River overpass pieces. I am considering repainting all of the components a sand color.
  • Figured out the height of the overpass. We are going to just clear any trains I run. Obviously, there can be no double-stacks on the PRR Panhandle!
  • Got the end wall design for the Strip Steel building worked out and on paper. This 3-D "backdrop" will be roughly 44" wide and 30" deep (at spots). It will have a ton of Tichy industrial windows.


That's it for now.

George
Updated 12/22/2010:

It's a good thing I had as much progress as I did leading up the previous post. The past 3 weeks have been consumed with family, car troubles, and work. However, some things did get done:

  • Made one more height adjustment to the Blooming Mill. What was that saying - "Measure once incorrectly, cut 3 times"?? Anyway, that's what I did. Finally, I have the correct height.
  • Also re-cut out the foamcore front of the Blooming Mill. Glued all the foamcore walls together and onto the frame.
  • Discovered the color of the prototype Strip Steel brick (yellow).


My immediate next steps are to get the foamcore roof on the Blooming Mill and order Tichy windows for the Strip Steel.

George
Updated 12/31/2010:

I removed some photos and added a new one. This last photo (#8) is of the Blooming Mill under construction. I've added foamcore walls, building front, and internal roof support to the wooden framework. The main roof and ventilator roof are ready to go as well, but doesn't appear in the photo.

You can see the prototype Blooming Mill in Photo 5 (left center) of this album.

George
Last edited by G3750
Updated 1/10/2011:

Couple of things to talk about:

  • To my great surprise, the PRR Panhandle photo album has been viewed over 15,000 times. If you add the 4 previous postings since 2005, you have over 43,000 hits. I thank you all for your patronage and support.
  • Progress on the Blooming Mill continues - siding has been added and the roof is in progress.
  • A friend surprised me with a large plotted poster (map from Rand McNally) of the Panhandle. I had it famed and it will hang in the train room.


More to come.

George
Last edited by G3750
Updated 1/14/2011:

Here's the latest:

  • I completed the roof, trim, and all major construction tasks on the Blooming Mill. For the first time, a second complete mill stood nearby my Open Hearth.
  • Last night we held the first Train Smoker, a name I made up to describe a gathering of friends and their children to view the layout and play with the trains. From all accounts, it was a great success. More will be posted on this event shortly.


In the very near future, I plan to add decals and some details to the Blooming Mill, order the windows needed to build the next structure (Strip Steel), and complete the highway overpass.

George
Last edited by G3750
Fantastic info, tho I M at the bottom of the heap control wise. I vote for phasing, believe its cheap insurance.

Good to see someone actually building out of fomecore and making good progress. Nicejob.

Thanks for the aside info on use of bus bars (building supply store) and/or the european style gang terminals (?) for junction wiring. I had several for some kind of use and was not able to decide what and how to use....

Oh yeah- R U doing something in the mill to simulate actual hot iron in ladle or ingots cooling? Could be quite imprissive!!!!!

again Thanks! Fine info and layout.

L
quote:
Originally posted by L Larson:
Fantastic info, tho I M at the bottom of the heap control wise. I vote for phasing, believe its cheap insurance.

Good to see someone actually building out of fomecore and making good progress. Nicejob.

Thanks for the aside info on use of bus bars (building supply store) and/or the european style gang terminals (?) for junction wiring. I had several for some kind of use and was not able to decide what and how to use....

Oh yeah- R U doing something in the mill to simulate actual hot iron in ladle or ingots cooling? Could be quite imprissive!!!!!

again Thanks! Fine info and layout.

L


Lars,

Thanks for the nice comments. Regarding activities or animation in the mills, I've certainly thought about something in the Open Hearth to simulate a pour. However, I've not hit upon anything that would be practical. For instance, I wanted to use a friction wheel to throw sparks coordinated with a sound module to simulate a pour. Trouble is, you don't really want sparks in an area with so many flammable materials around. So, I'm still thinking.

George
Updated 1/31/2011:

Recently, I have been struggling with the decision to re-do the front of my Blooming Mill. In trying to get the building ready for the Train Smoker, I rushed the application of siding and fudged a seam. I tried to correct it with paint, but it looks a bit shiny.

I took the building off the layout and looked at it again up close. From certain angles it looks OK, from others - not so much. I am going to try hiding the problem with weathering and see if that works. If it does, I will declare success. Otherwise...

That hasn't sopped me from ordering windows for the Strip Steel building or starting the detailed design.

George
Updated 2/4/2011:

No matter what the groundhog says, there will be at least 12 more weeks of model railroading this spring!

Accurately produced a full-size Microsoft Visio drawing (plan) for the front of the Weirton Strip Steel mill building onto three 11"x17" sheets of paper. The building front will be 44" wide with 7 bays and stand roughly 9" high (not counting ventilators and stacks). The building (really a 3-D backdrop) will be 5-sided and fit in a corner of the layout.

Haven't done the weathering yet on the Blooming Mill. Sometimes it's easier to work on the computer than the layout itself, but that's on the schedule for this weekend.

Talk at ya' soon.

George
Last edited by G3750
Updated 2/11/2011:

Baby steps. Sometimes it feels like I'm not moving forward at all. Misplaced the weathering powders and had to order a new set, so the Blooming Mill hasn't been touched.

Did cut a few pieces of craft wood for the framing of the Strip Steel Mill. Also bought some Evergreen styrene needed for that structure as well as Dullcote and Glosscote for decals.

George
Updated 2/16/2011:

Made a bit of progress:

  • I've got a outer frame built for the Strip Steel building. It's up on legs being leveled. I'm wrestling with some of the trackwork that encroachs on the space in front of the building. I need to keep a space between the climbing track and the front wall. Not sure if I will use a slope down to the building front or a retaining wall.
  • Starting to focus on completion of the highway overpass again. Gluing masonite to resin along a thin strip probably isn't a high percentage play. A friend has suggested the use of angle Plastruct pieces to cover the masonite and present a good surface for adherence to the Crow River resin guard walls. Definitely worth pursuing.
  • Put the weathered Blooming Mill back on the layout to check its appearance. Fortunately, the other buildings tend to mask the blemishes pretty well. Next step there is to apply the Weirton Steel decal, put it back on the layout, take a few photos, and declare victory!


That's it for now.

George
Updated 5/5/2011:

I've been preoccupied by other aspects of life (kids, health, York) over the past month and haven't done a lot on the Panhandle. However, the mind has percolating along. Here are the latest random musings to escape:

  • The way to finish the highway overpass at Crawford's Crossing is starting to take shape in my head. Thanks to a post on the Scenery Forum, I have a way to raise the piers to guarantee clearance. I bought the wood necessary to do this and will start this very shortly. Once the piers are supporting the overpass, I will work on the descending pier (an inclined plane of my own design). The final step will be to glue the side rails in place.

  • I've started gathering ideas, material, and information for the completion of the Blooming Mill's billboard. The billboard kit has been opened, I've printed a sign, and now I'm working on getting onto the backing and onto the building. Still need to drill the holes for the lights.

  • I've started searching my photo gallery of Weirton Steel for pictures of gas storage tank racks. The tanks are placed horizontally in rows on a girder framework. I'm not sure of their purpose, but on the layout they will serve to hide a track entering the side of the Open Hearth building. Plastruct has some parts that will work nicely. I'm roughing out the design and will shortly have the plans created in Visio.


That's it for now.

George
Updated 9/20/2011...

Non-train activities have been king around here for the past 6 months.

However, since the work is relatively mindless (no real planning required), I have been working on cleaning up the ingot molds that I had made. Finalizing them includes drilling, cutting, and sanding a hole in the top, painting the recessed slab orange, painint the rest of the ingot mold gray / rust, and weathering. Because I have 30+ molds to drill out, I am currently working on a jig to use in a drill press.

I also did an under the layout inspection and cycled the power. All TMCC functions working normally.

Hoping to find more time for the hobby soon.

George

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×