Skip to main content

Hello Fellow Railroaders, 

This is Allan I'm starting on my layout and I was wondering about something. My layout will consist of 3 levels & a Helix.1) Staging Aera, 2) Mainline, 3) Elevated Aera, 4) Helix. Should I start with the Staging aera first? or the Helix. 

Let's face it I'm a big boned person? I think I would get stuck a little if I try any other level. What should I do? 

Original Post

Replies sorted oldest to newest

Hi Bill, 

Thank you for your reply. You asked if the upper level is built on a fixed shelve on the wall. The upper level will be similar to the NYC like the Bronx. 

Does that sound right or crazy? If you need to ask me anything else my phone number is 1 (314)  537-4733. Don't hesitate to contact me late in the evening.

I hope to hear from you soon Thank you for taking the time to read my questions.

Sincerely 

Allan 

 

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×