Skip to main content

I am going to replace the current 18 gauge wires that go from my terminal block to the tracks with 14 gauge wire.  Some of the connections are now inaccessible due to a top level shelf that I installed.  So it it okay to simply "cut and cap" the old wires or is in absolutely necessary that they be entirely removed from the track?  Thank you for your time.

 

                                                                                              -Bob Baker

Original Post

Replies sorted oldest to newest

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×