Skip to main content

Reply to "NEW IN RUN 300-Aug/Sept OGR! Page 41: 10 X 10 "L" North Ridge mountain RR layout plan."

As NECrails suggested, I have added a connection at the lower left to bring trains from the outerloop back to the inner loop.   Unfortunately, the added O-54 turnout is a bit out of reach and below the bridge.   I will look at optimizing this later.

M1010LA-01v2d

Attachments

Images (1)
  • M1010LA-01v2d

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×