Skip to main content

Reply to "14x24 Atlas-O Layout Plan. With 11x19 FasTrack Version. Short Video of Trains Running Added!"

Thanks to all who commented and for the 'lively' discussion!

Just to circle back around, I have abandoned my preference for an interior location for the restroom.   Why:  the layout has expanded inward, both Eastwick and Westham now encroach on the interior operating space, and Bailey yard as well with four yard tracks with a separate East yard lead.   And of course the corner location is a more conventional location for a restroom - better for future use of the structure.

Balidas had a good idea:  the computer and keyboard are now under the layout at the right, with the keyboard able to pull/slide out from under the layout.   The computer monitor hangs on the East wall.  Shown is an alternate location for "Eastwick a la carte", when the computer is in use, and for fun to have a second location (might make more mods to this cart in the future).

Paul's idea of just a urinal in the restroom is a possible.   I will keep that idea in my "back pocket" if needed, but for now I will stay with the washbasin/commode combo to satisfy my lady visitors (and the wife!).  

A re-alignment of the lead to the turntable/engine service added 1/2" to the operating area there.   Re-aligning the curves of Bailey Yard with a center-rail spacing of 4.25" saved about 1" of operating area.M1224A_V5b

Attachments

Images (1)
  • M1224A_V5b
Last edited by Ken-Oscale

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×