Skip to main content

Reply to "2-6-0 Mogul E&T Coming Soon"

PROGRESS UP DATE

     We are rolling right along on this kit bashing project. A lot of work but it is coming together. We have taken the top vents off of the cab roof and it is now smooth and waiting for a single sliding hatch in the center.

     The fire box hump just forward of the cab has been reduced in width and is more in line with the rest of the sides of the boiler. A simulated door from the cab to the walk ways may be added using a decal in that area.

    More news later.

Dave, LBR 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×