On another wall there are four 16' subway staging tracks under an upper level town.
North facing views showing Homosote surface for the staging tracks:
The much discussed cleanout is visible center right.
These four tracks were to be a dead end but I just made another bridge and they are now pull through.
Good thing there was no permit required for bridging the gorge. The plan called for two, now it has grown to four. Cluttered, yes, but functionally needed.
South facing views plus the recently installed fifth level of three rail. Just gotta get some camo on the dang drain pipe!!
The staging yard throat above features triple siamesed 72"/76" curved turnouts with points immediately next to the frog by Brad Strong Signature switches.
The coal yard was a cantilevered add on bump out. Bendable plywood makes it fit in nicely.
This is what happens when you have no plans, too much wood and a free spirit. We call it "Capillary Bridges".