Skip to main content

Reply to "3rd Rail SD9's are coming"

Matt Makens posted:

Are you sure about that? If the CNW was set up for left handed running all of the signals would be on the other side of the tracks 

Careful here Matt. Have you ever been over the C&NW main line from Chicago to the Missouri River? When the C&NW installed ATC (late 1920s?) the new system did NOT include wayside signals, except at control points (cross-overs, etc.). Since the UP/CNW merger, the UP is reinstalling double track, CTC, and full way-side signaling.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×