Skip to main content

Reply to "3RS Plan for 25x18 based on John Armstrong plan"

Since you are interested in operations and want to keep the continous running.    You might consider changing your concept of the operations.      You have a yard area and terminal on the main table.    and  you have some staging off in another room.     Consider running "through" freights from staging to the main terminal.    There they would terminate,      Later a reverse move would be assembled at the yard and go back to staging.   

The cars that come in from staging would be classified into locals and a local engine (generally smaller) would take them out along the branch to deliver, and to pick  up outbound cars.     these outbound cars would them be assembled into the through freight (or transfer run) back to staging.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
330-757-3020

www.ogaugerr.com
×
×
×
×
×