Skip to main content

Reply to "4x10 Fastrack two-track main with O44.5 outside diameter"

Chuck

Thanks for the comment.  A major objective of the track plan was to make the layout challenging to have lots to things to do and operate.  My brother and I got bored with our oval and figure 8 Christmas layout in short order.  That is the reason for a TT, 5 train operation, 31 track switches, Wye and lots of operating accessories.  This layout was on the living room floor for only 2 months for 30 years and trains were ignored except for a train show or two.  Limited use and attention are some of the reasons the layout has lasted 44 years.

Charlie

Last edited by Choo Choo Charlie

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×