This weekend, I worked on leveling the bridge. For the longest time, my bridge just sat on the table, and the tracks would rise and fall as the train traveled on the bridge. I cut out the homasote and wired the bridge. I am very happy with the outcome. My original plan was to finish installing three more switches, (two 054 right Hand and 054/072 right hand curved switch) however with no expected delivery date from Atlas, my focus had changed to adding buildings. I will be working on the town scene next until the switches are available.
Attachments
Videos (1)