Skip to main content

Reply to "5x10 & 5x12 Atlas-O 2-Train Layout"

M512-08A_V1a

It took 8 minutes to revise the plan for 5x12, track, terrain, framework, trees, structures.   Including the time to create this image, edit it, and post it here: another 2 minutes, or 10 minutes.

M512-08A_V1b

With grades analyzed by the software, and my markings in blue.   The main grade is 3.7%, with a 2% elevation change easement section at the bottom, and a 1.5% elevation change easement at the top.   The elevation of the bridges and elevated plateau is raised to 6.5".   There is a 1-1/4" section at the grade changes, from 2% to 3.7%, and from 3.7% to 1.5% to ease the grade change transitions.  Two O54 turnouts are on grade, at either 2% or 1.5%.

Replying to Ted's comment above, in the first 4x10 design, the grade continue through the two sections that I have now made as the grade easements at 1.5% and 2%, so that added length with the shorter elevation (6", now 6.5") made the grade 3.5%.

If I recall correctly, my scale SD60M loco measures less than 3.5" in height, with the addition of 1/2" for roadbed and tie and rail height, that comes to 4".   So 6" is pretty reasonable (no double-stacks), and now 6.5" is nice.  

Attachments

Images (2)
  • M512-08A_V1a
  • M512-08A_V1b
Last edited by Ken-Oscale

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×