Skip to main content

Reply to "5X12 S-FASTRACK BUILD IN PHASES: with 4% Grade & 2% vertical easements, and hidden staging. WITH SIMILAR O and S 5X9 LAYOUT PLANS."

Experimenting with the Legacy controller to switch command routes.  It would seem from my experiments, that more turnouts in a route increased the probability that a turnout will not switch.  This maybe implies a voltage drop issue with say four switch machines all trying to switch at the same time.  I may do some experiments with this idea.  Currently, I am powering the layout with two CW-80s ganged together, putting out maximum voltage, with the engine running while I hit the route.  The turnouts take power from the track.

I also notice that if the route button is held down, the controller will send a command repeatedly in successive pulses.   I have even seen a route behave this way, with the button held the entire time: pulse-1: switch one fires, the others buzz.  Pulse-2, another switch fires, the others buzz, etc until all four turnouts have switched, and the button is released.

Sending a command to an individual turnout: they are all switching reliably as individuals.

The open circuit voltage output of the CW-80 is 17.9v.  

Last edited by Ken-Oscale

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×