Once you have verified all pickup rollers on the engine are connected together (as @gunrunnerjohn has directed above), then I suggest getting a piece of paper long enough to span from pickup to pickup on the engine. Mark on the paper the location of the pickups. You can then slide the paper along the center rail through the switch to verify that all the pickups do not fall into "non-rail" sections of the track.
|