Skip to main content

6.5' x 8' Temporary Layout - Simple Plan Request

Hello everyone!   Set up in our new house in CT.  Pictures below show the 6.5' x 8' footprint I have to work with in our unfinished basement for this year's Christmas layout.  I need to tear this down into a 4'x8' storage location when I am not working on it as this space doubles as a play area and work out area. 

I'm looking for simple track plan suggestions for this footprint.  I don't plan to go vertical this year and need to leave space for trees, houses, etc.  I have 2 manual switches (1 RH/1 LH), a 90 degree intersection, an acute/oblique angle X-intersection, and a log/mail/etc. dump along with the track pictured in the previous layout picture from MD.

 

IMG_0823IMG_0824

NOTE: not all slats inserted.  Test of strength of gap only as proof of conept before tear down.

IMG_0825

What I did last year:

2016 layout 22016 layout

Attachments

Images (5)
  • IMG_0823
  • IMG_0824
  • IMG_0825
  • 2016 layout 2
  • 2016 layout
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×