I took the advice from this forum, and a few other places, and came up with the resulting track plan. Basically put in the biggest curves I could, and then tried to ease any S curves by straightening out sections I could. In the lower left of the diagram, the outer loop would bridge over the inner loop. Not a whole lot of space to return it back to ground level with a decent grade, but I'm still trying to work those things out. I have plenty of room for additional switching at the top of the diagram, and I think it'd be nice to have some industries served by a spur, but then again we're talking about adding MORE switches. As usual, looking for some feedback for improvement. Thanks!
|