Skip to main content

Reply to "Video Added: Lionel Extended Truss Lift-Out Bridges on a 6' by 16' Fastrack Layout Plan"

By moving the passing siding to the top of the layout from the bottom, another operating plan is possible for two opposing trains, both using the crossing, controlled by two "on the ball" engineers.   [Train lengths are important as is switching "on the fly".]  Operating signals protecting the crossing would be great!

The turnouts at the top of the diagram will be hard to reach for maintenance, so access on both sides and one end would be ideal.

Attachments

Videos (1)
TwoOpposingTrains
Last edited by Ken-Oscale

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×