Great, I look forward to your email. Perhaps we can consider a plan with O-60 minimum. That would have the advantage of being able to operate equipment that requires O-54, in case you might like larger/scale at some time in the future (this current plan allows O-54 on the outside loop and passing tracks). -Ken
|