Skip to main content

Reply to "A 8x12 or 12x12 layout with 072"

I think you need to decide on a size first, then start tinkering with track layouts to accomplish what you want to do.  In a 12x12 layout, you should be able to have a couple of O72 (or preferably greater) dual tracks to allow you to run your big stuff.  That still leaves a lot of area to work with inside.

Depending on the space, you can get wider curves with an around-the-room format vs. a table format.  If you do a 12x12 table, consider having the center open with a lift bridge to access the inside.  Remember, you're going to have to reach stuff anywhere on the table, consider that in the planning.

You’re right. I am leaning more towards a 12x12 because that’s going to give me plenty of room to work. As for access panel, I’m for sure going to put them in.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×