Leandro Garcia posted:
Moonman posted:

Ok, I understand. This is a track fitment stage.

The wiring method suggested to you sounds ok. I like alternating the common wire to have both outside rails with common. Every 40 inches may be too many.

I use a 120 inch - 144 inch spacing between power connections.

How did you do it on the previous layout? It was operating properly before it was disassembled, yes?

How do you connect the 180 watt transformers? Did you make an adapter wire for the Molex plug or did you cut it off? I am asking because I want to be sure that you can identify the Hot (red) and the Common (black) wires of the 180 watt transformer.

I like your suggestion 120 inch! I thought that 40 inch many too!
Do you welded all connection tracks (between tracks)?

In my previous layout was very bad ! I had only 4 track-feeders ! 

I have two Lionel Direct TMCC/Legacy (6-34120). In my previous layout I used only one.

I like the "screw-it" method for Atlas track used by Ingenerio 1. A small hole is drilled in the base of the rail and the wire is inserted into the hole. It is sercured with a #1 sheet metal screw.

I can link the method to you if you wish to use it. 

Soldering to the bottom of the rail is good. The black needs to be removed from the center rail and a special flux used for the nickel-silver alloy.

let me know about the screw-it method.