Maybe I got too deep. I need to know how to wire my planned layout so I can run both loops independently of each other. I believe the Power Masters provide a switch between conventional & command. With each loop set to this configuration, how is it wired from the transformer? Each loop being on a separate handle/brick from the ZW. I may be wrong, but just looking for a starting point as I plan this thing out. Thanks
|