Skip to main content

Reply to "Action at the Steel Mill. Friday 21-12-1972"

Despite a sore back I'm happy with the progress so far.

I am making a sign for the building at the moment. the workshop is bashed from a Heljan kit will eventually have a fully detailed interior in fact if you lift the building up there are a pile of detail items inside waiting, good place to store them. The floor is not glued down so I can detail the interior of the workshop at the bench. 

Because we operate the layout every week and enjoy switching there is not a lot of room for details like pipes and castings sitting in the yards the tracks come first the scenery second. The crane needs some streaks of rust and dirt on it along with everything else ! Roo.  

 

DSC01200DSC01201

DSC01202

Attachments

Images (3)
  • DSC01200
  • DSC01201
  • DSC01202
Last edited by Roo

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×