Skip to main content

Reply to "Action at the Steel Mill. Friday 21-12-1972"

The progress with the coil loading building is moving along slowly, next up is the gantry crane. I am pleased with the building so far it is all nice and square been doing it in the house on a small bench risky but it's to cold outside in the workshop I'm a wimp!    Roo.

 

DSC03855

Attachments

Images (1)
  • DSC03855

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×