Skip to main content

Reply to "Action at the Steel Mill. Friday 21-12-1972"

OK. The track is cleaned and free of plaster the next stage was to place the Coil Loading building over the Plaster or concrete slab to see how it sits.

There is a couple of small High spots detected once these are leveled out and the building sits level the next stage is to carve the ends of the track for the wheel stops and if I feel like it patch a couple of potholes, after that its painting but not right this minute it is still damp maybe tomorrow morning. The whole thing has taken about three hours apart from the turnout. I know there are other ways of paving track and I have tried them all over the years but I still come back to the old Plaster of Paris hard to teach an old dog new tricks I guess or maybe this is just the best way! Ha Ha. Good job for a wet Sunday. Roo.

 

DSC03910

Attachments

Images (1)
  • DSC03910

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×