Skip to main content

Reply to "Active Caboose Storage"

Any railroad I worked for had caboose servicing tracks in each yard. Light repairs were done on the RIP track and heavy repairs were shipped to a designated heavy repair point. Caboose hops were used frequently and it was also not uncommon to see more than a couple cabooses on a train. During the daylight hours we would send a local or yard cut out with a red flag in the knuckle if no caboose was available.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×