Skip to main content

Reply to "Addicted to BlueRail"

I took the easy route, I did an LC+ Camelback with NiMh battery packs.  Once I doubled them up and gave it full voltage, it has full function.  Based on the battery pack ratings and the current draw in operation with a load, I figure I should easily get three hours out of a charge.  Since the LC+ already runs on direct RF communications, all it really required was adding the battery pack!

LC+ Camelback Upgrade to Battery Power

I have to admit, you are 100% correct.  You already have everything you need in LC+ to go battery.  Adding or changing boards would not make much sense.

BTW... the PS3 board for inspection should arrive today. 

Ron

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×