@Ken-Oscale posted:Hi James. Because the upper loop is single-track, I am not seeing much that can be enhanced by making the lift-out bridge double-track.
I could double-track the upper-loop with O45 (affecting the industry tracks and etc.). That might add something. -Ken
Ken, many thanks for your reply! Perhaps a double-track lift-out bridge would be a square peg in a round hole considering the level of design maturity in your layout. As a starting point of a new layout design, how much flexibility (more action) do you believe is added if your access is double tracked? Even more complicated is the fact that I have a corner entry to work with. That seems to necessitate the lift-out bridge being at a 45 degree angle with the adjacent walls.