Skip to main content

Reply to "Almost Gone Buildings from Menards! (Updated: 02/12/18)"

My Power Plant arrived today from Fremont, Nebraska, one roof vent and the roof access hatch was off, I put them back on, no big deal. All the lights work, but, seem dim, was wondering if I need to order a power supply with a higher output. I used the plug for my Morton Salt to test the Power Plant, and the lights are bright on the Salt building when I use it, so, not sure if the power plant lights are just that way, being an older building.

Even if buying another plug doesn't make the lights brighter, I'd be fine with the softer light they are emitting. I have my eye on four other Menards buildings, but, will have to buy them as funds permit. Thanks again for the heads up, Mark, I really like this building, I should have purchased it sooner!

Rusty

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×