Skip to main content

Reply to "American Flyer Skyscraper & Docking Zeppelin - COMPLETE! - Updated 11 May 20"

More progress on the Zep!   

First, the side fins are installed and the main body is ready to come together:

IMG_7595

Next, the gondola is complete minus passenger window glass and propeller blades.  Window glass should go in tonight , time permitting:

IMG_7596IMG_7597

prop mounts ready, and they actually turn (manually):

IMG_7598

inside view.   I mounted the light strip to the floor so as to make it less visible from below:

IMG_7599

windshields and observation "bubble".   I'm not great at painting lines, but should be minimally noticeable from a couple feet away:

IMG_7600

Attachments

Images (6)
  • IMG_7595
  • IMG_7596
  • IMG_7597
  • IMG_7598
  • IMG_7599
  • IMG_7600

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×