Skip to main content

Reply to "Another ballasting puzzlement"

Here are a few pictures of the ballasting job I did on my past layout and my current one.  

Ore stockpile start

20200429_144639Current layout has WS coarse cinders glued to a Styrofoam substrate. TABLE top is 1/2  inch MDF,  3/4 inch Styrofoam,  then a top layer of 1/4 inch Styrofoam cut out to inset the tracks.  This makes the tracks appear like they are sunk into the ground and also you use less ballast. 

DSC00211DSC00201

These 2 photos are of my previous layout.  If you live near a menards,  they sell a 50 lb bag of blasting sand. It's an abrasive  grit for stripping paint and rust from metal. I  bought a bag for $7.99 less my 11% rebate.  1 bag could cover several large layouts (a bag fills a 5 gallon bucket ). 

Attachments

Images (4)
  • Ore stockpile start
  • DSC00211
  • DSC00201
  • 20200429_144639

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×