Skip to main content

Reply to "Another FasTrack post..."

Just thinking some more, in one section of my layout I have some elevated Fastrack that had a strength/length problem. I got around that by filling the base of the Fastrack with concrete-patching epoxy. Works perfectly. Strong and rigid beyond my wildest expectations.

Just thinking out loud, if you were a glutton for punishment, you could take a Fastrack section, remove the rails, fill the base solidly with epoxy, and then cut it along the existing ties. This would give you ties with ribs that fit into the bottom of the rails. Would of course need to paint the epoxy to look like wood, and trim of the ends.

Sounds dumb, but with a good setup on a small table saw it might not be bad at all. 

Just my $.02 worth. NO refunds.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×