Skip to main content

Reply to "any New Haven fans ...."

Paul

The line over the Hell Gate bridge interchanging with the LIRR was handled by the New Haven. Sometimes they went all the way to the float bridges in Bay Ridge. The LIRR that was usually third rail but they had some switchers that used the overhead to handle the work also. I believe they were BB-3, small paired box cab bodies (you'd like them).

Last edited by Scotie

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×