Skip to main content

Reply to "Anyone pull the 3rd rail from their track to convert to 2 rail?"

It would be easier to start over with two rail track in my opinion.  Also, switches would need to be totally rewired and physically modified to run two rail equipment with scale flanges.  NH Joe

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×