Skip to main content

Reply to "Apartment Building Front"

The steps and stairs are done.

The top level of the steps started out as a box. The bottom portion are 1/4 in square rods stacked on top of each other (1, 2, then 3). Making the steps this way gives a 45 degree angle which is useful (see below).

The railing has to be scratched built. I use 60 x 60 and 40 x 60 strips. Since the angle is 45 degrees construction was relatively easy.

Next up is paint.

Brenneman building 001Brenneman building 002Brenneman building 003 

Attachments

Images (3)
  • Brenneman building 001
  • Brenneman building 002
  • Brenneman building 003

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×