Finishing up my layout. I may try to add one final internal curved run, but this would mean that on the main straight section of my track I would have three switches in a row. A through train would have to travel the straight sections of the switches right in a row, 1, 2, 3. The would be O gauge switches, not O27.
Am I asking for trouble? Is this generally regarded as a bad thing to do? (I'm not looking for headaches.)
If so, I can scrap the extra curve run idea.
Thanks,
Mannyrock