Skip to main content

Reply to "Are trains stuck on the water?"

I've stated it elsewhere on this forum, but everything is going through a temporary period of adjust as economies come back online.  In my full-time world of the construction industry, residential windows are anywhere from twelve to more weeks out for standard sizes.  Customs sizes are anyone's guess.  Steel joists for a small 10,000 s.f. commercial building I worked on were ordered in July and the General Contractor was thrilled that the delivery date got moved up to February 2022 from April.  Even personally, I went to a local big-box construction materials retailer looking for an 8x10 sheet of vinyl for a shed.  30 day lead time.  I got indoor/outdoor carpet instead. 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×