Skip to main content

Reply to "arriving from Atlas and MTH"

Me too!     I hated when the SW-1 tooling went to Lionel.  They have no intention of doing anything in 2 rail at this time.   Atlas considered doing the S-2 in 2 rail, but the retooling was more extensive/expensive than they wanted to do at this point.   Not to mention that the S-2 would be have been vertical shaft motors, which some 2 railers would whine about.   The demand for a 2 rail switcher is pretty large, but getting it done is another thing.  And the  what RR's?  everyone wants something different.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×