Skip to main content

Reply to "As far as trains you run--"

Mixed, mostly.  I have been doing mini operating sessions on my layout,  I select about 7 or 8 cars that are to be delivered to various customers about the layout.  I run a local using a single road switcher (GP9, RS-11) to deliver and pick up cars from the various customers.  I also have a second line that I interchange cars with.  As the second line interchanges and crosses the main line several times, I have to keep on my toes when having an operating session.  A typical session last about 2 hours.  If I want to just let the trains run without a specific purpose I will sometimes run a unit grain train, coal train or a train of gondolas with pipe loads.  These trains are usually pulled by several high horsepower units MU'd.  I just turn them loose and let them roam the layout.

I guess it all depends upon how much mental effort I want to put into running my trains on any given day.

Tom

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×